These frames were designed for extremely low temperature of -550oC and very high wind pressure. We used the normal rolled steel sections available in our country and designed them economically for desired conditions which were approved after testing the frames in the actual conditions. Also, we has designed the lashings for shipping these frames without damage onboard
Detailed design of 70 MT capacity movable hopper assembly for a supplier company. This heavy structure was mounted on wheels running on tracks. It was very important part of the whole conveying system indigenous state of art method and technology was used by us to design and fabricate this assembly. Besides, conveyor galleries, trestles, transfer towers, reversible conveyors, head & tail structures.
Fixing the location of plant site on hill slope and structural design and details of reservoirs
Structural and architectural design and details of reservoirs and pump house pipe thrust
Analysis & design of steel tower and foundation for heavy wind load and pipe thrust
10mt high fire water monitor towers for HPCL Mahul refinery for Agnice Fire Protection Ltd.3/28/2011
Analysis & design of steel tower and foundation for heavy wind load and pipe thrust
20mt high fire water monitor towers for HPCL Mahul refinery for Tyco Fire & Security India Pvt. Ltd3/28/2011
Analysis of design of steel tower and foundation for heavy wind load and pipe thrust
Detailed engineering of entire external hydrant system around piers AB & CD and also MTB. Flexibility Analysis of pipe by using software to get support loads and design of pipe supports, thrust blocks, valve pits etc. Pits designed for aircraft load.
Analysis and design of steel towers for heavy wind forces. Pipe analysis
Design and detail engineering of Steel towers
|